Vertex Corporate Tower
Commercial Featured Build

Vertex Corporate Tower

Client / Developer
Apex Holdings Ltd.
Location
Gulshan Avenue, Dhaka
Execution Timeline
Jan 2023 — Jun 2025
Delivery Status
Completed
Vertex Corporate Tower
Primary Site Plate
Vertex Corporate Tower
Scope & Methodology

Architectural & Engineering Execution

The Vertex Corporate Tower stands as an iconic architectural benchmark on the skyline. Spanning over 420,000 square feet of prime commercial workspace, the structure combines post-tensioned reinforced concrete slabs with a central shear core engineered to withstand severe seismic and cyclonic lateral forces.

Key highlights include a quadruple-height atrium lobby, eight high-speed destination-dispatch elevators, intelligent building management automation, and a rooftop solar array that offsets 18% of base building electrical loads.

01

Precision Structural Engineering

High-tensile reinforced concrete core with post-tensioned floor plates, engineered for zero-deflection structural performance under extreme seismic loads.

02

Sustainable Material Integrity

35% reduction in embodied carbon achieved through geopolymer slag mixes and recycled structural steel, certified for high durability environments.

Technical Data Sheet

Project ID
PRJ-0001
Sector
Commercial
Client Entity
Apex Holdings Ltd.
Location
Gulshan Avenue, Dhaka
Status
Completed
Start Date
Jan 15, 2023
Delivery
Jun 30, 2025
Project Execution Progress

Chronological Milestones

Phased delivery schedule, QA validation gates, and certified structural completions.

Apr 2023

Subsurface Geotechnical Piling & Deep Excavation

In Execution
Execution of 120 deep bored cast-in-situ piles (diameter 1200mm to 48m depth) and diaphragm perimeter wall for 3-level basement excavation.
Sep 2023

Mat Foundation & Basement Superstructure Waterproofing

In Execution
Continuous monolithic concrete pour of 3,800m³ raft slab with crystalline integral waterproofing and Bentonite membrane protection.
Jul 2024

Reinforced Concrete Core & 28-Story Structural Topping Out

In Execution
Completion of cast-in-place central shear core walls and post-tensioned floor slabs up to level 28 rooftop plant room.
Dec 2024

Unitized Double-Glazed Facade & Exterior Enclosure

In Execution
Installation of 18,500m² unitized curtain wall glazing with thermal break aluminum mullions and Low-E acoustic solar coatings.
Jun 2025

MEP Commissioning, LEED Platinum Certification & Handover

In Execution
Comprehensive testing and balancing of HVAC chillers, emergency generators, fire suppression, and official occupancy handover to client.