Highland Logistics & Industrial Distribution Hub
Industrial Featured Build

Highland Logistics & Industrial Distribution Hub

Client / Developer
TransGlobal Freight Corp.
Location
Gazipur Industrial Zone, Dhaka
Execution Timeline
Mar 2024 — Delivered
Delivery Status
Ongoing
Highland Logistics & Industrial Distribution Hub
Primary Site Plate
Highland Logistics & Industrial Distribution Hub
Scope & Methodology

Architectural & Engineering Execution

Commissioned to support regional supply chain modernization, the Highland Logistics Center features a clear interior height of 14 meters, clear-span steel portals, and superflat laser-screeded concrete slabs designed for high-density automated racking systems.

Currently in the structural assembly phase, the project includes specialized refrigerated cold-storage chambers, advanced ESFR fire sprinkler loops, and extensive heavy truck marshalling aprons.

01

Precision Structural Engineering

High-tensile reinforced concrete core with post-tensioned floor plates, engineered for zero-deflection structural performance under extreme seismic loads.

02

Sustainable Material Integrity

35% reduction in embodied carbon achieved through geopolymer slag mixes and recycled structural steel, certified for high durability environments.

Technical Data Sheet

Project ID
PRJ-0002
Sector
Industrial
Client Entity
TransGlobal Freight Corp.
Location
Gazipur Industrial Zone, Dhaka
Status
Ongoing
Start Date
Mar 01, 2024
Delivery
In Progress
Project Execution Progress

Chronological Milestones

Phased delivery schedule, QA validation gates, and certified structural completions.

May 2024

Site Grading, Drainage Network & Foundation Footings

In Execution
Earthwork compaction of 25-acre logistics yard, storm retention basins, and reinforced pad footings for clear-span steel columns.
Sep 2024

Clear-Span Structural Steel Portal Frame Erection

In Execution
Assembly and erection of 45-meter clear-span primary steel trusses, gantry crane rails, and roof purlin support systems.
Dec 2024

Laser-Screed Superflat Industrial Concrete Flooring

In Execution
Precision laser-screed pouring of 350,000 sq.ft jointless steel-fiber reinforced floor slabs compliant with DIN 15185 high-density VNA racking.
Mar 2025

Automated Dock Levelers, Insulated Wall Panels & ESFR Fire Loops

In Execution
Installation of 40 hydraulic dock levelers, PIR sandwich wall insulation panels, and overhead Early Suppression Fast Response sprinkler arrays.
Jul 2025

Refrigerated Cold-Storage Zone & Final Facility Commissioning

In Execution
Testing of multi-temperature ammonia/CO2 cascade refrigeration systems, solar roof integration, and municipal occupancy permitting.